Road surface deterioration has created a longitudinal depression along the kerb, presenting a potential trip hazard for pedestrians and an increased risk of vehicle or cyclist damage. The defect should be inspected and repaired before further deterioration occurs.

Reported via desktop in the Pothole category anonymously at 14:36, Friday 3 July 2026

Sent to Aberdeenshire Council less than a minute later. Council ref: 972953.

A section of the road adjacent to the kerb has deteriorated, resulting in a longitudinal depression with broken asphalt and signs of progressive subsidence. The defect appears to be worsening and may indicate failure of the road edge or the underlying ground.

Safety Risk:

Potential trip hazard for pedestrians. Increased risk of damage to vehicle tyres, wheels and suspension. Hazard for cyclists and motorcyclists, who could lose control if a wheel enters the depression. Ongoing deterioration may result in a larger road failure if left unaddressed.

Updates

  • Category changed from ‘Pothole on pavement or Footpath’ to ‘Pothole’

    Posted by Aberdeenshire Council at 14:36, Friday 3 July 2026

  • Thank you for letting us know about this issue. We will now investigate and provide you with an update within the next 7 days.

    You can find out more about our road maintenance on our website at www.aberdeenshire.gov.uk/roads-and-travel/roads/maintenance.

    Posted by Aberdeenshire Council at 14:36, Friday 3 July 2026

  • We’ve had a look at the issue and we have now passed your enquiry to our local Roads Team to assess what can be done to resolve the matter. We’ll let you know when that assessment has taken place.

    Thanks again for your report

    State changed to: Action scheduled

    Posted by Aberdeenshire Council at 07:23, Monday 6 July 2026

  • We’re currently developing our approach to displaying priorities and target completion times to keep residents better informed. In the meantime, we’ll continue to assess the level of risk and allocate resources based on urgency, location, and the availability of repair teams.

    This defect has been added to our works programme and will be scheduled accordingly.

    • To be Completed by: 07/07/2027
    • Road category: 4B
    • Road speed limit: 30
    • No of Potholes Recorded: 1
    • Maximum Pothole Depth:
    • Maximum Pothole Width:

    The date shown above represents the latest target for completion based on our current programme of works. This may be brought forward where resources, operational priorities, or coordination with other activities allow. Defects assessed as posing a higher risk are prioritised for earlier repair whenever possible.

    Thank you for your patience while we carry out this work.

    State changed to: Planned

    Posted by Aberdeenshire Council at 04:00, Wednesday 8 July 2026

Only the original reporter may leave updates. If you made the original report please log in to leave an update.